Briarcliff Road Drainage Improvements
Pre-design · Texas · Last reported Sep 2025
Source: Dodge
Briarcliff Road Drainage Improvements -Briarcliff Road Drainage Improvements consist of removing existing undersized culverts and replacing with a 10x9 foot box culvert, raising the road one foot and lowering the creek invert while widening the channel. The project includes 1,700 lineal feet of channel improvements. The improvements will eliminate flooding in 11 homes and eliminate road overtoppin
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Residential, Commercial, Government
- Location
- Temple, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Briarcliff Road Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Briarcliff Road Drainage Improvements -Briarcliff Road Drainage Improvements consist of removing existing undersized culverts and replacing with a 10x9 foot box culvert, raising the road one foot and lowering the creek invert while widening the channel. The project includes 1,700 lineal feet of channel improvements. The improvements will eliminate flooding in 11 homes and eliminate road overtopping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Temple |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Residential, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
