Briarwood Water Main Replacement REBID
Sector: Water Supply and Storage • Location: Briarwood, Virginia, United States of America
Source: Dodge
The Albemarle County Service Authority ACSA is seeking proposals from qualified contractors to furnish and install approximately 5,900 linear feet of 4-inch through 8-inch zinc-coated ductile iron pipe DIP with V-Bio enhanced polyethylene encasement. Appurtenant work shall include crosses, bends, tees, sleeves, caps, plugs or other fittings; valves and valve boxes; hydrants; interconnections; wate
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Government, Metal, Waste Processing and Treatment, Commercial, Steel, Manufacturing (Industrial)
- Location
- Briarwood, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Briarwood Water Main Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Albemarle County Service Authority ACSA is seeking proposals from qualified contractors to furnish and install approximately 5,900 linear feet of 4-inch through 8-inch zinc-coated ductile iron pipe DIP with V-Bio enhanced polyethylene encasement. Appurtenant work shall include crosses, bends, tees, sleeves, caps, plugs or other fittings; valves and valve boxes; hydrants; interconnections; water meters and meter boxes; water services and re-connections; sewer manhole frame and covers in as... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Briarwood |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Government, Metal, Waste Processing and Treatment, Commercial, Steel, Manufacturing (Industrial) |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
