Brickenwood Kitchen Electrical Upgrade Ph2
Sector: Power Generation (CCGT) • Location: New Bedford, Massachusetts, United States of America
Source: Dodge USA
The Project consists of but not limited to new kitchen and bathroom GFI receptacles electrical load centers in the basement first or second floors extending wiring and conduit and related work as specified within the contract documents. Refer to attachment.
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Government, Road, Commercial, Manufacturing (Industrial)
- Location
- New Bedford, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brickenwood Kitchen Electrical Upgrade Ph2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of but not limited to new kitchen and bathroom GFI receptacles electrical load centers in the basement first or second floors extending wiring and conduit and related work as specified within the contract documents. Refer to attachment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | New Bedford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Government, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
