Brickyard Site Expansion
Sector: Power Generation (CCGT) • Location: Kentucky, Canada
Source: TradingView
The Company has secured approval for a 5 MW expansion at its Brickyard site in Kentucky, bringing the total planned capacity of the site to 15 MW. Construction is expected to begin in December 2025. The project is anticipated to be completed in a similar timeframe as the recently added 15 MW of power capacity, bringing the total power capacity to 50 MW.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Kentucky, Canada
- Updated
- 22 Jul 2026
- Source
- TradingView
ConstructChat
Ask ConstructChat about Brickyard Site Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Company has secured approval for a 5 MW expansion at its Brickyard site in Kentucky, bringing the total planned capacity of the site to 15 MW. Construction is expected to begin in December 2025. The project is anticipated to be completed in a similar timeframe as the recently added 15 MW of power capacity, bringing the total power capacity to 50 MW. |
Original sector | Digital Infrastructure |
Location
Country | Canada |
State | Kentucky |
Source
Source | TradingView |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
