logo
ProjectBidding

Bridge & Creek Stabilization & Erosion Control - No. 206

One of 10,000+ projects Taiyo tracks in Mississippi.

Source: Dodge

his project consists of splicing steel piling (approx. 30 lin. ft.), adding concrete encasements, backfilling wash areas, grading slopes and ditches, constructing paved ditches, and adding riprap for slope stabilization under East Main Bridge over Town Creek. The Contract Documents may be examined at the following locations: TUPELO CITY HALL, 71 EAST TROY STREET, TUPELO, MS 38804

Status
Prospective
Sector
Water Supply and Storage, Steel, Car parking, Road, Government, Cement, Waste Processing and Treatment, Bridge, Automotive, Commercial, Metal
Location
Tupelo, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bridge & Creek Stabilization & Erosion Control - No. 206

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge & Creek Stabilization & Erosion Control - No. 206” is an infrastructure initiative in the Water Supply and Storage sector, located in Tupelo, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

his project consists of splicing steel piling (approx. 30 lin. ft.), adding concrete encasements, backfilling wash areas, grading slopes and ditches, constructing paved ditches, and adding riprap for slope stabilization under East Main Bridge over Town Creek. The Contract Documents may be examined at the following locations: TUPELO CITY HALL, 71 EAST TROY STREET, TUPELO, MS 38804

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Tupelo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Car parking, Road, Government, Cement, Waste Processing and Treatment, Bridge, Automotive, Commercial, Metal

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project