logo
ProjectClosed

Bridge & Culvert Evaluation

Sector: Water Supply and Storage • Location: Trenton, Ontario, Canada

Source: Dodge USA

The City is responsible for ensuring that their bridges are kept safe and in good repair. This has to be done through the performance of regular bridge inspections (every 2 years) in accordance with the Ontario Structure Inspection Manual or equivalent. Under regulations, municipalities are responsible for passing load limit bylaws. In place of the MTO review, engineering recommendations to suppor

Status
Closed
Sector
Water Supply and Storage, Bridge, Government, Waste Processing and Treatment, Road, Commercial
Location
Trenton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge & Culvert Evaluation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge & Culvert Evaluation” is an infrastructure initiative in the Water Supply and Storage sector, located in Trenton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City is responsible for ensuring that their bridges are kept safe and in good repair. This has to be done through the performance of regular bridge inspections (every 2 years) in accordance with the Ontario Structure Inspection Manual or equivalent. Under regulations, municipalities are responsible for passing load limit bylaws. In place of the MTO review, engineering recommendations to support the load limit and the duration for which it is valid, must be signed off for and stamped by tw...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Trenton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Government, Waste Processing and Treatment, Road, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project