logo

Bridge 12-N Retaining Wall Replacement

Sector: Bridge • Location: Centre Wellington, Ontario, Canada

Source: Dodge USA

Project
Closed

Replacement of a bridge concrete retaining wall for structure 12-N located on Washington St., Salem, within the Township of Centre Wellington. The following is a general but not necessarily a complete description of the works: Removal of the existing retaining wall Construction of a 5.0m wide x 3.0m high reinforced concrete retaining wall Poured concrete curb Drainage outlet improvements Steel bea

Status
Closed
Sector
Bridge, Cement, Rail, Steel, Government, Road, Metal, Commercial, Waste Processing and Treatment
Location
Centre Wellington, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge 12-N Retaining Wall Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge 12-N Retaining Wall Replacement” is an infrastructure initiative in the Bridge sector, located in Centre Wellington, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of a bridge concrete retaining wall for structure 12-N located on Washington St., Salem, within the Township of Centre Wellington. The following is a general but not necessarily a complete description of the works: Removal of the existing retaining wall Construction of a 5.0m wide x 3.0m high reinforced concrete retaining wall Poured concrete curb Drainage outlet improvements Steel beam guide rail adjustments Ditch and embankment regrading

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Centre Wellington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Cement, Rail, Steel, Government, Road, Metal, Commercial, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project