Bridge 38 Replacement Project on Route 5
Sector: Road • Location: Rockingham, Vermont, United States
Source: Vermont Journal
Replacement of Bridge 38 on Route 5 due to structural deficiency. The project includes repairing and replacing deteriorated portions, widening the roadway to 10-foot lanes, 4-foot shoulders, and adding 3 feet of space per side. The bridge will be closed for a maximum of 28 days with a detour via I-91 between exits 6 and 7. Preclosure work starts June 16, with closure between July 14 and August 11,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replacement of Bridge 38 on Route 5 due to structural deficiency. The project includes repairing and replacing deteriorated portions, widening the roadway to 10-foot lanes, 4-foot shoulders, and adding 3 feet of space per side. The bridge will be closed for a maximum of 28 days with a detour via I-91 between exits 6 and 7. Preclosure work starts June 16, with closure between July 14 and August 11, and target completion by October 15. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Eli Lilly’s Parenteral Product and Device Manufacturing Facility, Concord, North Carolina
- Amgen’s Drug Substance Manufacturing Plant, Wake County, North Carolina
- Vertex Pharmaceuticals’ Boston Campus
- Roche Diagnostics PCR Diagnostic Kits
