Bridge 9 Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
for the construction of a 13.2m span slab-on-girder bridge. The contract involves the removal of the existing bridge structure, supply and placement of reinforced concrete, supply and placement of reinforcing steel bar, steel box beam railing, reconstruction of roadway approaches, asphalt paving and guide rails.
- Status
- Under Construction
- Sector
- Bridge, Steel, Rail, Cement, Road, Government, Metal, Commercial
- Location
- Kenilworth, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge 9 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for the construction of a 13.2m span slab-on-girder bridge. The contract involves the removal of the existing bridge structure, supply and placement of reinforced concrete, supply and placement of reinforcing steel bar, steel box beam railing, reconstruction of roadway approaches, asphalt paving and guide rails. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kenilworth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Steel, Rail, Cement, Road, Government, Metal, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
