logo
ProjectClosed

Bridge Construction No. 1490012

Sector: Steel • Location: Edina, Missouri, United States of America

Source: Dodge USA

The proposed work includes the construction of a new 204 -0 , three-span bridge with prestressed concrete NU-35 girders, steel HP12x53 piling, concrete abutments, concrete piers, steel guardrail, traffic control, and other required appurtenances

Status
Closed
Sector
Steel, Cement, Road, Government, Bridge, Metal, Commercial
Location
Edina, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Construction No. 1490012

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Construction No. 1490012” is an infrastructure initiative in the Steel sector, located in Edina, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed work includes the construction of a new 204 -0 , three-span bridge with prestressed concrete NU-35 girders, steel HP12x53 piling, concrete abutments, concrete piers, steel guardrail, traffic control, and other required appurtenances

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Edina

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Cement, Road, Government, Bridge, Metal, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project