logo
ProjectBidding

Bridge Culvert No. 3 Rehabilitation

Sector: Bridge • Location: Alaska Highway, British Columbia, Canada

Source: Dodge USA

The work for this requirement is to rehabilitate bridge culvert no.3 at Km 384.7 of the Alaska Highway in British Columbia. This contract involves the removal and disposal of existing culvert materials, and the installation of CSP and SWSP culvert liners using trenchless method and lining. It includes highway widening, installation of concrete collars, roadside barriers, and gabions. The work also

Status
Prospective
Sector
Bridge, Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Mass Transit, Rail, Commercial
Location
Alaska Highway, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Culvert No. 3 Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Culvert No. 3 Rehabilitation” is an infrastructure initiative in the Bridge sector, located in Alaska Highway, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work for this requirement is to rehabilitate bridge culvert no.3 at Km 384.7 of the Alaska Highway in British Columbia. This contract involves the removal and disposal of existing culvert materials, and the installation of CSP and SWSP culvert liners using trenchless method and lining. It includes highway widening, installation of concrete collars, roadside barriers, and gabions. The work also involves channel excavation, stream substrate placement, hydroseeding, and the implementation of...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Alaska Highway

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Mass Transit, Rail, Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project