Bridge Culvert Replacement and Other Work
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
Bridge Culvert Replacement and Other Work 593:02 BF 9684 - Carrying Hwy. 593 over Watercourse, 23 km South of Gadsby (kilometer 15.411 to 15.411) Central Region. Central Region APPROXIMATE QUANTITIES: 1 LS Demolition and Disposal of Bridge Structure 52 M CSP with Couplers - Supply (1.8 m Dia.) 52 M CSP - Assembly (1.8 m Dia.) 1 LS Roadway Work
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Bridge, Road, Commercial
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge Culvert Replacement and Other Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge Culvert Replacement and Other Work 593:02 BF 9684 - Carrying Hwy. 593 over Watercourse, 23 km South of Gadsby (kilometer 15.411 to 15.411) Central Region. Central Region APPROXIMATE QUANTITIES: 1 LS Demolition and Disposal of Bridge Structure 52 M CSP with Couplers - Supply (1.8 m Dia.) 52 M CSP - Assembly (1.8 m Dia.) 1 LS Roadway Work |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Bridge, Road, Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
