Bridge File 2199 Bridge Culvert Replacement
Sector: Chemical (Industrial) • Location: Dunmore, Alberta, Canada
Source: Dodge
The Contractor shall install of a new bridge culvert located on Township Road 74 (Thelma Road) between highway 41 and Eagle Butte Road south of Elkwater (SW 30-7-2-W4M). The Contractor shall install a 2.4 m dia. Polymer coated Corrugated Steel Pipe (CSP) Culvert by 50 m invert length, as per the Drawings and Standard Specifications for Bridge Construction. The Culvert will be located on 300 RHF sk
- Status
- Closed
- Sector
- Chemical (Industrial), Bridge, Water Supply and Storage, Road, Steel, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government, Metal
- Location
- Dunmore, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bridge File 2199 Bridge Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall install of a new bridge culvert located on Township Road 74 (Thelma Road) between highway 41 and Eagle Butte Road south of Elkwater (SW 30-7-2-W4M). The Contractor shall install a 2.4 m dia. Polymer coated Corrugated Steel Pipe (CSP) Culvert by 50 m invert length, as per the Drawings and Standard Specifications for Bridge Construction. The Culvert will be located on 300 RHF skew to Township Road 74. Existing is a 1.2 m diameter culvert and a 1.8 m diameter culvert. This C... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Dunmore |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Bridge, Water Supply and Storage, Road, Steel, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government, Metal |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in Canada
- City of Portage la Prairie Water Pollution Control Facility Upgrades for Nutrient Reduction
- 407 Express Toll Route (ETR), Ontario
- Pacific NorthWest LNG Project, British Columbia
- Northeast British Columbia (NEBC) Expansion Project, British Columbia
- Accucaps Industries, Manufacturing Capacity – Canada
- River Street Storm Sewer Rehabilitation
- Northern Petrochemical Ammonia and Methanol Production Facility
- Shell Polaris Carbon Capture Project
