logo

Bridge Maintenance and Other Work

Sector: Bridge • Location: Nisku, Alberta, Canada

Source: Dodge USA

Project
Start

This contract will include acting as Prime Contractor (per OH&S) mobilization, traffic accommodation and repair work at 6 different sites. Without limiting the provisions of these Specifications and Contract, the Scope of Work at these sites is as follows: Bridge File 08044 Tributary to Conjuring Creek (2 2130mm x 1550mm x 14.3m arch CSP, Square to Road) TSS Testing Install Concrete Floor in both

Status
Under Construction
Sector
Bridge, Road, Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Government
Location
Nisku, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Maintenance and Other Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Maintenance and Other Work” is an infrastructure initiative in the Bridge sector, located in Nisku, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This contract will include acting as Prime Contractor (per OH&S) mobilization, traffic accommodation and repair work at 6 different sites. Without limiting the provisions of these Specifications and Contract, the Scope of Work at these sites is as follows: Bridge File 08044 Tributary to Conjuring Creek (2 2130mm x 1550mm x 14.3m arch CSP, Square to Road) TSS Testing Install Concrete Floor in both Culverts Supply and Install Heavy Rock Riprap (Class 1) Supply and Install Straw/Fibre Rolls Brid...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Nisku

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Government

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project