Bridge Maintenance
One of 10,000+ projects Taiyo tracks in Mississippi.
Source: Dodge
REMOVAL OF ASPHALT, REMOVAL OF ASPHALT, UNCLASSIFIED EXCAVATION (FM), GRANULAR MATERIAL, CRUSHED STONE HOT MIX ASPHALT, ST, 12.5MM, (OVERLAY), HOT MIX ASPHALT, ST, 12.5MM, (BASE REPAIR), HOT MIX ASPHALT, ST, 12.5MM, (LEVELING), MAINTENANCE OF TRAFFIC, TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS, ROADBED RECLAIMATION
- Status
- Closed
- Sector
- Government, Road, Bridge, Commercial
- Location
- Tupelo, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bridge Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | REMOVAL OF ASPHALT, REMOVAL OF ASPHALT, UNCLASSIFIED EXCAVATION (FM), GRANULAR MATERIAL, CRUSHED STONE HOT MIX ASPHALT, ST, 12.5MM, (OVERLAY), HOT MIX ASPHALT, ST, 12.5MM, (BASE REPAIR), HOT MIX ASPHALT, ST, 12.5MM, (LEVELING), MAINTENANCE OF TRAFFIC, TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS, ROADBED RECLAIMATION |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Tupelo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Bridge, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
