Bridge No 123 Structure Replacement REBID
Sector: Steel • Location: Port Clinton, Pennsylvania, United States of America
Source: Dodge USA
This project will include the replacement of the existing 3-span riveted steel thru-girder bridge with a new 2-span Prestressed Concrete PA I-Beam Bridge structure on new substructure units. Additionally included in this project is the replacement of the existing Port Clinton Borough Sewer Line, approach roadway paving, line painting, earthwork, and guiderail updates among other items of work.
- Status
- Closed
- Sector
- Steel, Water Supply and Storage, Cement, Waste Processing and Treatment, Seaport, Bridge, Road, Government, Metal, Commercial
- Location
- Port Clinton, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge No 123 Structure Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include the replacement of the existing 3-span riveted steel thru-girder bridge with a new 2-span Prestressed Concrete PA I-Beam Bridge structure on new substructure units. Additionally included in this project is the replacement of the existing Port Clinton Borough Sewer Line, approach roadway paving, line painting, earthwork, and guiderail updates among other items of work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Port Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage, Cement, Waste Processing and Treatment, Seaport, Bridge, Road, Government, Metal, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
