Bridge No. 24 Structure Replacement REBID
Bid results · Pennsylvania · Last reported Jan 2025
Source: Dodge
The project involves the replacement of the existing two span structure with a new single-span precast adjacent box beam bridge. Additionally, roadway approach work and a waterline relocation are included within this project. Items of work for the contract are identified more specifically in the Bid Form, Contract Specifications and Contract Documents.
- Status
- Closed
- Sector
- Government, Bridge, Road, Commercial
- Location
- Tremont, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bridge No. 24 Structure Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the replacement of the existing two span structure with a new single-span precast adjacent box beam bridge. Additionally, roadway approach work and a waterline relocation are included within this project. Items of work for the contract are identified more specifically in the Bid Form, Contract Specifications and Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Tremont |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Road, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
