logo
ProjectClosed

Bridge NR-44-017 Replacement

Sector: Automotive • Location: Harshaw, Wisconsin, United States of America

Source: Dodge USA

In general, the work consists of: replacement of the existing timber pedestrian bridge with a new prefabricated pedestrian 90-foot long steel truss bridge supported on concrete abutments. The bridge shall support a 20,000-pound vehicle load and a pedestrian load of 90 psf. Handrails shall be 54 inches in height. The clear width shall be 12 feet. A snowmobile wearing surface shall be investigated o

Status
Closed
Sector
Automotive, Steel, Car parking, Forest Products and Packaging, Bridge, Cement, Road, Metal, Commercial
Location
Harshaw, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge NR-44-017 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge NR-44-017 Replacement” is an infrastructure initiative in the Automotive sector, located in Harshaw, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In general, the work consists of: replacement of the existing timber pedestrian bridge with a new prefabricated pedestrian 90-foot long steel truss bridge supported on concrete abutments. The bridge shall support a 20,000-pound vehicle load and a pedestrian load of 90 psf. Handrails shall be 54 inches in height. The clear width shall be 12 feet. A snowmobile wearing surface shall be investigated on the deck surface. Trail closure signage will need to be provided.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Harshaw

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Automotive, Steel, Car parking, Forest Products and Packaging, Bridge, Cement, Road, Metal, Commercial

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project