logo
ProjectBid Results

Bridge Pb011 Replacement

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge USA

Replacement of Structure PB011. The Work includes: Installation of erosion and sediment control measures; Removal of an existing 6.1 m span ( /-) cast-in-place concrete rigid frame; Construction of a new 7.0 m precast concrete box culvert; Waterproofing and backfill of the precast concrete box culvert; Management of the watercourse during construction to allow the work to be completed in-the-dry;

Status
Closed
Sector
Commercial, Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Government
Location
Drayton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Pb011 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Pb011 Replacement” is an infrastructure initiative in the Commercial sector, located in Drayton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of Structure PB011. The Work includes: Installation of erosion and sediment control measures; Removal of an existing 6.1 m span ( /-) cast-in-place concrete rigid frame; Construction of a new 7.0 m precast concrete box culvert; Waterproofing and backfill of the precast concrete box culvert; Management of the watercourse during construction to allow the work to be completed in-the-dry; Approximately 40 /- metres of roadworks, including asphalt removal, excavation, granular placemen...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Drayton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Government

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project