logo

Bridge Power CCGT Power Plant

Sector: Natural Gas • Location: Ghana

Source: World Bank Group

Project
Active

The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independen

Project Information FAQ

Project Information

5 Q
The project “Bridge Power CCGT Power Plant” is an infrastructure initiative in the Natural Gas sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independent Power Producer, the project will benefit from a long term (20-year) PPA with Electricity Company of Ghana. At 12.5 cents per kilowatt hour (kWh), Bridge Power will deliver power at one of the lowest costs among the country’s IPPs, whose tariffs currently range between 13 to 20 cents per kilowatt hour. The power plant can be powered by either LPG, natural gas, or diesel. Project is being implemented in two stages, each of 200 MW. Total investment in the plant is approximately $953 million and will be funded via debt and equity. The $ 510 million debt for the project is split between 7 banks (Societe Generale. Standart Chartered, ABSA Bank, Hungarian Export-Import Bank, Emerging Africa Infrastructure Fund and CDC Group). Financial close took place on December 16, 2019. https://asokoinsight.com/news/construction-of-1bn-400mw-bridge-power-begins https://earlypowerltd.com/project/ https://www.ghanaweb.com/GhanaHomePage/business/Construction-of-US-1bn-400MW-bridge-power-begins-533333 https://ijglobal.com/data/transaction/45543/bridge-power-ccgt-power-plant-400mw

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data