Bridge Power CCGT Power Plant
Sector: Natural Gas • Location: Ghana
Source: World Bank Group
The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independen
- Status
- Prospective
- Sector
- Natural Gas, Power Generation (CCGT), Bridge, Government, Commercial
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bridge Power CCGT Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independent Power Producer, the project will benefit from a long term (20-year) PPA with Electricity Company of Ghana. At 12.5 cents per kilowatt hour (kWh), Bridge Power will deliver power at one of the lowest costs among the country’s IPPs, whose tariffs currently range between 13 to 20 cents per kilowatt hour. The power plant can be powered by either LPG, natural gas, or diesel. Project is being implemented in two stages, each of 200 MW. Total investment in the plant is approximately $953 million and will be funded via debt and equity. The $ 510 million debt for the project is split between 7 banks (Societe Generale. Standart Chartered, ABSA Bank, Hungarian Export-Import Bank, Emerging Africa Infrastructure Fund and CDC Group). Financial close took place on December 16, 2019. https://asokoinsight.com/news/construction-of-1bn-400mw-bridge-power-begins https://earlypowerltd.com/project/ https://www.ghanaweb.com/GhanaHomePage/business/Construction-of-US-1bn-400MW-bridge-power-begins-533333 https://ijglobal.com/data/transaction/45543/bridge-power-ccgt-power-plant-400mw |
Original sector | Energy |
Budget |
Location
Country | Ghana |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Power Generation (CCGT), Bridge, Government, Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
