logo

Bridge Power CCGT Power Plant

Sector: Commercial • Location: Ghana

Source: World Bank Group

Project
Active

The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independen

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Natural Gas, Bridge, Government
Location
Ghana
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bridge Power CCGT Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bridge Power CCGT Power Plant” is an infrastructure initiative in the Commercial sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction and operation of a 400 MW power plant located in Tema. Early Power Limited (EPL Consortium) is developing the project in which General Electric Power (20%), Endeavour Energy (60%) and Sage (part of Quantum Power) (20%) are the sponsors which contribute with a total of $ 191 million. This is a new, greenfield project initiated on a BOO modality. As an Independent Power Producer, the project will benefit from a long term (20-year) PPA with Electricity Company of Ghana. At 12.5 cents per kilowatt hour (kWh), Bridge Power will deliver power at one of the lowest costs among the country’s IPPs, whose tariffs currently range between 13 to 20 cents per kilowatt hour. The power plant can be powered by either LPG, natural gas, or diesel. Project is being implemented in two stages, each of 200 MW. Total investment in the plant is approximately $953 million and will be funded via debt and equity. The $ 510 million debt for the project is split between 7 banks (Societe Generale. Standart Chartered, ABSA Bank, Hungarian Export-Import Bank, Emerging Africa Infrastructure Fund and CDC Group). Financial close took place on December 16, 2019. https://asokoinsight.com/news/construction-of-1bn-400mw-bridge-power-begins https://earlypowerltd.com/project/ https://www.ghanaweb.com/GhanaHomePage/business/Construction-of-US-1bn-400MW-bridge-power-begins-533333 https://ijglobal.com/data/transaction/45543/bridge-power-ccgt-power-plant-400mw

Original sector

Energy

Budget

Location

Country

Ghana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Natural Gas, Bridge, Government

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project