Bridge Rehabilitation Project
Closed · Russian Federation
Source: World Bank Group
The Bridge Rehabilitation Project will contribute to the preservation of the Russian road network through a program of bridge rehabilitation, replacement and maintenance. The principal objectives of the project are to: 1) improve the condition of selected high priority bridges on the federal and regional road systems, and interchanges with high traffic levels on federal highways; 2) assist in ref
- Status
- Closed
- Sector
- Road, Bridge, Automotive, Government
- Location
- Russia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bridge Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bridge Rehabilitation Project will contribute to the preservation of the Russian road network through a program of bridge rehabilitation, replacement and maintenance. The principal objectives of the project are to: 1) improve the condition of selected high priority bridges on the federal and regional road systems, and interchanges with high traffic levels on federal highways; 2) assist in reform of the institutional structure of road administration and the contracting industry, and further the use of competitive bidding; 3) strengthen the capabilities of the Federal Highway Department of the Russian Federation (FHD) to manage the bridges under its jurisdiction; 4) reduce a backlog of bridge rehabilitation and maintenance on regional roads for up to five participating regions, namely Kirov, Leningrad, Novgorod, Tver and Vologda Oblasts and Moscow City; and 5) improve the administrative, technical, and financial relationship of FHD and the regions of the Russian Federation. The main components of the project are: 1) bridge works on federal and regional roads including rehabilitation, repair, reconstruction, replacement, and widening of about 200-300 high priority federal and regional bridges and the improvement of 2-3 interchanges on the federal highways including grade separation; 2) bridge management equipment comprising vehicles, equipment, materials and supplies as an aid for better management of bridges; and 3) technical assistance, design and supervision of works and traning, including specialized consultants. |
Original sector | FY17 - Public Administration,Transportation |
Budget |
Location
Country | Russia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Automotive, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
