Bridge Rehabilitation
Bid results · British Columbia · Last reported Jul 2024
Source: Dodge USA
Work includes, but is not limited to: removal of two 15m long steel pedestrian bridges to a painting facility, installation of new temporary pedestrian bridges, repair of damaged steel sections, recoating of the bridges, installation of new timber decking and mid rails, removal of existing timber fencing and installation of new MMCD railing with foundations
- Status
- Closed
- Sector
- Commercial, Steel, Rail, Bridge, Forest Products and Packaging, Government, Road, Metal
- Location
- Langley, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes, but is not limited to: removal of two 15m long steel pedestrian bridges to a painting facility, installation of new temporary pedestrian bridges, repair of damaged steel sections, recoating of the bridges, installation of new timber decking and mid rails, removal of existing timber fencing and installation of new MMCD railing with foundations |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Langley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Steel, Rail, Bridge, Forest Products and Packaging, Government, Road, Metal |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
