logo
ProjectBidding

Bridge Repairs and Resurfacing

Sector: Steel • Location: Newark, New Jersey, United States of America

Source: Dodge USA

Proposals are invited for Contract No. P100.662, which involves replacing deteriorated concrete bridge deck slabs and sidewalks; repairing deck spalls; repairing and reconstructing deck joints; replacing headers; removing asphalt surfacing; placing new membrane waterproofing; resurfacing approach roadways and bridge decks; pavement striping; substructure repairs; structural steel repairs; temporar

Status
Prospective
Sector
Steel, Cement, Car parking, Road, Bridge, Metal, Automotive, Commercial
Location
Newark, New Jersey, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Repairs and Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Repairs and Resurfacing” is an infrastructure initiative in the Steel sector, located in Newark, New Jersey, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposals are invited for Contract No. P100.662, which involves replacing deteriorated concrete bridge deck slabs and sidewalks; repairing deck spalls; repairing and reconstructing deck joints; replacing headers; removing asphalt surfacing; placing new membrane waterproofing; resurfacing approach roadways and bridge decks; pavement striping; substructure repairs; structural steel repairs; temporary stringer supports; bearing replacements; emergency and routine bridge repairs under cost plus c...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

Newark

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Cement, Car parking, Road, Bridge, Metal, Automotive, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project