logo
ProjectBidding

Bridge Replacement and Culvert Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Bridge 83-14.7 and 83-19.2 Replacement - NOTICE ONLY The County of Huron (County) is seeking to engage the services of a qualified contractor for the replacement of Black Creek Bridge (83-14.7), a 20 m single span rigid frame bridge, located on Huron County Road 83 (Dashwood Road) approximately 400 m east of Parr Line and Ausable 1 Bridge (83-19.2), a 27.6 m two-span rigid frame structure, located

Status
Prospective
Sector
Airport, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial
Location
Goderich, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Replacement and Culvert Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Replacement and Culvert Improvements” is an infrastructure initiative in the Airport sector, located in Goderich, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bridge 83-14.7 and 83-19.2 Replacement - NOTICE ONLY The County of Huron (County) is seeking to engage the services of a qualified contractor for the replacement of Black Creek Bridge (83-14.7), a 20 m single span rigid frame bridge, located on Huron County Road 83 (Dashwood Road) approximately 400 m east of Parr Line and Ausable 1 Bridge (83-19.2), a 27.6 m two-span rigid frame structure, located on Huron County Road 83 approximately 0.9 km east of Airport Line. The work also includes 248 m ...

Procurement method

Location

Country

Canada

State

Ontario

City

Goderich

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project