logo

Bridge Replacement on Route B

Sector: Bridge • Location: Ellington, Missouri, United States

Source: KBSI Fox 23 Cape Girardeau News | Paducah News

Project
Under Construction

Construction crews will replace the bridge over Logan Creek and perform drainage improvements on Route B in Reynolds County, reducing the road to one lane with some restrictions.

Status
Under Construction
Sector
Bridge, Road, Waste Processing and Treatment
Location
Ellington, Missouri, United States of America
Updated
22 Jul 2026
Source
KBSI Fox 23 Cape Girardeau News | Paducah News

ConstructChat

Ask ConstructChat about Bridge Replacement on Route B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Replacement on Route B” is an infrastructure initiative in the Bridge sector, located in Ellington, Missouri, United States. Taiyo aggregates data on it from KBSI Fox 23 Cape Girardeau News | Paducah News.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction crews will replace the bridge over Logan Creek and perform drainage improvements on Route B in Reynolds County, reducing the road to one lane with some restrictions.

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Ellington

Source

Source

KBSI Fox 23 Cape Girardeau News | Paducah News

URL

More Details

Record type

Project

Sector

Bridge, Road, Waste Processing and Treatment

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project