Bridge Replacement on State Road 60
Planned · Nevada · Last reported Mar 2025
Source: WDRB
The project involves the replacement of a bridge on State Road 60 in Clark County. It is scheduled to start on Monday, aiming to improve safety and traffic flow in the area.
- Status
- Prospective
- Sector
- Road, Bridge
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- WDRB
ConstructChat
Ask ConstructChat about Bridge Replacement on State Road 60
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the replacement of a bridge on State Road 60 in Clark County. It is scheduled to start on Monday, aiming to improve safety and traffic flow in the area. |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | WDRB |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
