Bridge Replacement REBID
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge USA
Bridge replacement of the existing single span steel truss bridge with timber deck. Supported on stone abutments and with reinforced concrete cap on spread footings. The proposed structure will be a single span prestressed composite boxbeam bridge on existing abutments with minimal roadway improvement work.
- Status
- Closed
- Sector
- Steel, Forest Products and Packaging, Bridge, Cement, Road, Government, Metal, Commercial
- Location
- Wellston, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge replacement of the existing single span steel truss bridge with timber deck. Supported on stone abutments and with reinforced concrete cap on spread footings. The proposed structure will be a single span prestressed composite boxbeam bridge on existing abutments with minimal roadway improvement work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Wellston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Forest Products and Packaging, Bridge, Cement, Road, Government, Metal, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
