logo
ProjectClosed

Bridge Replacement TR58- 2.98

Sector: Government • Location: Tiffin, Ohio, United States of America

Source: Dodge

The project involves the replacement of the existing, single-span, truss bridge with a new, single-span, prestressed concrete box beam superstructure on new concrete abutments supported by steel H-piles

Status
Closed
Sector
Government, Cement, Steel, Road, Commercial, Bridge, Metal
Location
Tiffin, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bridge Replacement TR58- 2.98

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Replacement TR58- 2.98” is an infrastructure initiative in the Government sector, located in Tiffin, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the existing, single-span, truss bridge with a new, single-span, prestressed concrete box beam superstructure on new concrete abutments supported by steel H-piles

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Tiffin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Cement, Steel, Road, Commercial, Bridge, Metal

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project