Bridge Replacement
Sector: Power Transmission • Location: Idaho Falls, Idaho, United States of America
Source: Dodge USA
The project will replace the existing bridge and relocate existing utilities that run underneath the abutments. The proposed bridge will have a span of 40 and a curb-to-curb width of 37 . The proposed bridge with have two lanes that are 12 wide and include 6.5 shoulders on either side. There are also 6.5 sidewalks planned on either side of the bridge. The proposed bridge will be single-span precas
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will replace the existing bridge and relocate existing utilities that run underneath the abutments. The proposed bridge will have a span of 40 and a curb-to-curb width of 37 . The proposed bridge with have two lanes that are 12 wide and include 6.5 shoulders on either side. There are also 6.5 sidewalks planned on either side of the bridge. The proposed bridge will be single-span precast prestressed voided slabs with a 5 concrete cast in place deck and a 3 hot mix asphalt overlay w... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- LOT-12 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LOT-7 HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- LOT-4 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
