logo
ProjectClosed

Bridge Replacement

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge

Bridge File 01459 (NW 18-42-11 W4) located 25 km south of Sedgewick on Range Road 120. Work includes the removal of the existing 8.5m HC girder bridge on a timber treated substructure and replacement with a new 6.0m SL-510 girder bridge on a steel substructure

Status
Closed
Sector
Bridge, Forest Products and Packaging, Steel, Government, Road, Commercial, Metal
Location
Sedgewick, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Sedgewick, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge File 01459 (NW 18-42-11 W4) located 25 km south of Sedgewick on Range Road 120. Work includes the removal of the existing 8.5m HC girder bridge on a timber treated substructure and replacement with a new 6.0m SL-510 girder bridge on a steel substructure

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Sedgewick

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Forest Products and Packaging, Steel, Government, Road, Commercial, Metal

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project