Bridge St & Maple Ave Reconstruction
Sector: Water Supply and Storage • Location: Erving, Massachusetts, United States of America
Source: Dodge USA
The Base Bid consists of three schedules of work. Schedule A scope of work includes construction of two catch basins, one drain manhole, one stormwater treatment system, 80 linear feet of 15 HDPE pipe, 560 square yards of roadway reconstruction, removal on an existing stone wall and installation of 2,150 square feet of segmental block retaining wall, temporary excavation support, surface restorati
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Base Bid consists of three schedules of work. Schedule A scope of work includes construction of two catch basins, one drain manhole, one stormwater treatment system, 80 linear feet of 15 HDPE pipe, 560 square yards of roadway reconstruction, removal on an existing stone wall and installation of 2,150 square feet of segmental block retaining wall, temporary excavation support, surface restoration and associated work. Schedule B scope of work consists of 690 square yards of milling and over... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
