Bridge Structure Safety Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of roadside safety improvements at four bridge and culvert sites including Shriner s Creek (S021C), Schisler Road (S093C), Garner Road (M017C), and Stanley Avenue (S105B). Construction will include installing new and replacement steel beam guide rail and posts, thrie beam guide rail and posts, and end treatments.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Rail, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Niagara Falls, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bridge Structure Safety Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of roadside safety improvements at four bridge and culvert sites including Shriner s Creek (S021C), Schisler Road (S093C), Garner Road (M017C), and Stanley Avenue (S105B). Construction will include installing new and replacement steel beam guide rail and posts, thrie beam guide rail and posts, and end treatments. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Niagara Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Rail, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
