logo
ProjectBid Results

Bridge Superstructure and Abutment Substructure Replace

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Bridge Superstructure and Abutment Substructure Replacement and Other Work 564:08 BF 09271 - Carrying Hwy 564 over Serviceberry Creek, 10 km SW of Rockyford10 days Total Suspended Solids (TSS) Testing 36 piles Pile Set-up (Driven Piles) 180 metres Supply of Piling - Galvanized Steel H-Pile 296 metres Supply of Piling - Plain Steel H-Pile 476 metres Pile Driving 1 550 kilograms Corrosion Resistant

Status
Closed
Sector
Bridge, Steel, Road, Metal, Commercial
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge Superstructure and Abutment Substructure Replace

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge Superstructure and Abutment Substructure Replace” is an infrastructure initiative in the Bridge sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Superstructure and Abutment Substructure Replacement and Other Work 564:08 BF 09271 - Carrying Hwy 564 over Serviceberry Creek, 10 km SW of Rockyford10 days Total Suspended Solids (TSS) Testing 36 piles Pile Set-up (Driven Piles) 180 metres Supply of Piling - Galvanized Steel H-Pile 296 metres Supply of Piling - Plain Steel H-Pile 476 metres Pile Driving 1 550 kilograms Corrosion Resistant Reinforcing Steel - Supply 1 550 kilograms Reinforcing Steel - Place 325 square metres Waterproof...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Steel, Road, Metal, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project