Bridge the B2B Trail Connection into Downtown Dexter
Sector: Manufacturing (Industrial) • Location: Dexter, Michigan, United States
Source: The Sun Times News
The Bridge the B2B campaign aims to raise $250,000 to complete the final segment of the Border to Border Trail into downtown Dexter. This project includes the construction of 0.8 miles of trail and the restoration of the historic Bell Road Bridge over Mill Creek, enhancing connectivity between Dexter, Chelsea, and Ann Arbor.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Bridge, Road
- Location
- Dexter, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- The Sun Times News
ConstructChat
Ask ConstructChat about Bridge the B2B Trail Connection into Downtown Dexter
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bridge the B2B campaign aims to raise $250,000 to complete the final segment of the Border to Border Trail into downtown Dexter. This project includes the construction of 0.8 miles of trail and the restoration of the historic Bell Road Bridge over Mill Creek, enhancing connectivity between Dexter, Chelsea, and Ann Arbor. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Dexter |
Source
Source | The Sun Times News |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Bridge, Road |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Tampa Bay Seawater Desalination Plant
- Sinking Creek Wastewater Treatment Plant Expansion, Tennessee
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Riley Army Base, Kansas
- Fort Benning, Georgia
- Fort Dix, US Army Base, New Jersey
