logo
ProjectClosed

Bridge to Culvert Replacement

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Dodge USA

Bridge to Culvert Replacment. The work generally comprises of the removal and disposal/salvage of a single span timber bridge, installation of 3-1800mm diameter polymer coated CSP culverts, sub cut and recompaction of trench bottom, placement of non-woven geotextile, backfill and compaction of granular bedding material and clay embankment, topsoil removal and replacement, hydraulic seeding of all

Status
Closed
Sector
Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Chemical (Industrial), Waste Processing and Treatment, Road, Government, Manufacturing (Industrial)
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bridge to Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bridge to Culvert Replacement” is an infrastructure initiative in the Commercial sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge to Culvert Replacment. The work generally comprises of the removal and disposal/salvage of a single span timber bridge, installation of 3-1800mm diameter polymer coated CSP culverts, sub cut and recompaction of trench bottom, placement of non-woven geotextile, backfill and compaction of granular bedding material and clay embankment, topsoil removal and replacement, hydraulic seeding of all disturbed areas, and place riprap.

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Chemical (Industrial), Waste Processing and Treatment, Road, Government, Manufacturing (Industrial)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project