logo
ProjectPlanned

Bridger Pipeline Project

One of 9,699 projects Taiyo tracks in Montana.

Source: Hi-Line Today

A proposed 647-mile, 36-inch buried pipeline to transport about 550,000 barrels of crude oil daily from the Canadian border in Phillips County, Montana, to an existing terminal near Guernsey, Wyoming. The project crosses private, state, and federal lands and is under environmental review.

Status
Prospective
Sector
Oil and Gas
Location
Phillips County, Montana, United States of America
Updated
22 Jul 2026
Source
Hi-Line Today

ConstructChat

Ask ConstructChat about Bridger Pipeline Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bridger Pipeline Project” is an infrastructure initiative in the Oil and Gas sector, located in Phillips County, Montana, United States. Taiyo aggregates data on it from Hi-Line Today.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 647-mile, 36-inch buried pipeline to transport about 550,000 barrels of crude oil daily from the Canadian border in Phillips County, Montana, to an existing terminal near Guernsey, Wyoming. The project crosses private, state, and federal lands and is under environmental review.

Original sector

Energy

Location

Country

United States of America (USA)

State

Montana

City

Phillips County

Source

Source

Hi-Line Today

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project