Brielle Draw Train Bridge Replacement
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: NewsBreak: Local News & Alerts
The project involves replacing the Brielle Draw train bridge, a single-track movable railroad drawbridge built in 1911 that spans the Manasquan River and connects Brielle and Point Pleasant Beach. The bridge lies along New Jersey Transit’s North Jersey Coast Line. The replacement aims to add a second rail and improve infrastructure resiliency to prevent flooding.
- Status
- Prospective
- Sector
- Rail, Bridge, Government
- Location
- Brielle, New Jersey, United States of America
- Updated
- 19 Nov 2026
- Source
- NewsBreak: Local News & Alerts
ConstructChat
Ask ConstructChat about Brielle Draw Train Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing the Brielle Draw train bridge, a single-track movable railroad drawbridge built in 1911 that spans the Manasquan River and connects Brielle and Point Pleasant Beach. The bridge lies along New Jersey Transit’s North Jersey Coast Line. The replacement aims to add a second rail and improve infrastructure resiliency to prevent flooding. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Brielle |
Source
Source | NewsBreak: Local News & Alerts |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
