Brier Creek Pump Station Improvements REBID
Sector: Water Supply and Storage • Location: Raleigh, North Carolina, United States of America
Source: Dodge USA
The Project consists generally of the following major items: BASE BID: Replacement of existing motor control center and pump control system Replacement of existing conduit and wiring Installation of a new 1,800 gpm pump and associated piping Replacement of existing surge control valve Addition of bypass pump connection Replacement of existing slide gates in influent channels Removal of existing un
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brier Creek Pump Station Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists generally of the following major items: BASE BID: Replacement of existing motor control center and pump control system Replacement of existing conduit and wiring Installation of a new 1,800 gpm pump and associated piping Replacement of existing surge control valve Addition of bypass pump connection Replacement of existing slide gates in influent channels Removal of existing underground storage tank Replacement of other miscellaneous components ALTERNATE BID: No. 1 Diesel ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
