logo
ProjectUnder Construction

Brierly Basin Floating Solar Array

The owner, status and timeline of this project. A free account opens every field.

Source: pv magazine Australia

Construction of Australia's largest floating solar array with a 500 kW system installed on the Brierly Basin water storage reservoir in Warrnambool, Victoria. The project features about 1,200 bifacial panels mounted on pontoons floated on the reservoir, designed to rise and fall with water levels. It aims to generate over 600,000 kWh of renewable energy annually, reduce electricity costs, and cut

Status
Under Construction
Sector
Solar, Government, Water Supply and Storage, Power Generation (CCGT), Commercial
Location
Warrnambool, Victoria, Australia
Updated
22 Jul 2026
Source
pv magazine Australia

ConstructChat

Ask ConstructChat about Brierly Basin Floating Solar Array

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brierly Basin Floating Solar Array” is an infrastructure initiative in the Solar sector, located in Warrnambool, Victoria, Australia. Taiyo aggregates data on it from pv magazine Australia.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of Australia's largest floating solar array with a 500 kW system installed on the Brierly Basin water storage reservoir in Warrnambool, Victoria. The project features about 1,200 bifacial panels mounted on pontoons floated on the reservoir, designed to rise and fall with water levels. It aims to generate over 600,000 kWh of renewable energy annually, reduce electricity costs, and cut greenhouse gas emissions by more than 600 tonnes per year.

Original sector

Energy

Budget

Location

Country

Australia

State

Victoria

City

Warrnambool

Source

Source

pv magazine Australia

URL

More Details

Record type

Project

Sector

Solar, Government, Water Supply and Storage, Power Generation (CCGT), Commercial

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project