logo

Brightman Street Bridge Replacement

Sector: Automotive • Location: Thailand

Source: Road Traffic Technology

Project
Closed

The bridge construction has been delayed several times. The new bridge will give a 60ft clearance above the water as opposed to 30ft with the old bridge. The third phase of construction is now underway. The Brightman Street Bridge replacement project will see a 922ft vehicle and pedestrian crossing built over the Taunton River between Somerset and Fall River in Bristol County, Massachusetts (US Ro

Project Information FAQ

Project Information

4 Q
The project “Brightman Street Bridge Replacement” is an infrastructure initiative in the Automotive sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The bridge construction has been delayed several times. The new bridge will give a 60ft clearance above the water as opposed to 30ft with the old bridge. The third phase of construction is now underway. The Brightman Street Bridge replacement project will see a 922ft vehicle and pedestrian crossing built over the Taunton River between Somerset and Fall River in Bristol County, Massachusetts (US Route 36/State Route 138). The bridge will replace an older steel bridge built in 1908 that can no longer be repaired at economic cost. The new bridge is a two leaf Bascule design on two main piers with a drawbridge that creates a 200ft shipping channel with a 60ft clearance. The bridge will be owned and operated by MassHighway and is expected to cost $312m to construct. While the bridge does not have an official name, the local Portuguese community has suggested ‘Miguel Corte-Real Bridge’ after the Portuguese explorer who discovered the area in the 16th century. Delays Plans for the bridge were considered during the 1970s and 1980s. In 1989 the US Coastguard objected to the size of the proposed bridge opening, which delayed the plans until the late 1990s with construction getting underway in 1999. The project was then further delayed because the funds were needed for the over budget ‘Big Dig’ project in Boston. The project was restarted but was soon delayed again due to reports of poor quality concrete in the piling, which required testing. Construction started properly by the Southeastern Regional Planning & Economic Development District and MassHighway in May 2007 and completion is expected in autumn 2012. Construction The engineering for the bridge is being carried out by Construction Technologies & Engineering Inc and will include integrated specialty bike paths and a fishing pier. The development of the bridge has been carried out by Kenney Development in three phases. The construction contractor for phase two was Jay Cashman Inc and the project manager was the Massachusetts Highway Department. The phase two work consisted of the construction of reinforced concrete piers, abutments and pier protection structures for the bridge in the City of Fall River and the Town of Somerset. The work has included construction work, installing turbidity screens, steel sheeting, and pier protection structures, structural and cofferdam excavation. Specific projects included reinforcing concrete abutments and piers on land and water, steel sheeting for 11 cellular cofferdams, steel H-piles, 14 temporary deepwater cofferdams, cofferdam and structural excavation, installing 36in diameter pipe piles, and mechanically stabilising surrounding earth walls. Phase three construction In July 2008 the third phase of construction began on the bridge and included two civil engineering and construction companies in a 50/50 partnership called Cianbro and Middlesex taking over the work. Subcontractors working on the project include Briggs Engineering (quality control); Regis Steel (rebar installation); Algar (wall form and concrete for secondary bridges); Moulison North (roadway electrical); Raito (drilled shafts); Moretrench (soil nailing and SOE); Aggregate Industries (paving); Liddell (line striping); Cardi (concrete supplier); Independent Concrete (pump truck service for concrete) and Delucca Fence (roadway guardrail). When the project is completed the bridge will include 5,025 yards of retaining walls, 470t of steel H-piles, two miles of roadway and 15 million pounds of structural steel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data