logo

Brighton Beach Road Reconstruction

Sector: Water Supply and Storage • Location: Duluth, Minnesota, United States of America

Source: Dodge USA

Project
Closed

The project consists of full depth reconstruction of Brighton Beach Road along a new alignment through Brighton Beach Park from TH 61 to Congdon Boulevard. The work includes turn lanes on TH 61, bituminous roadway, curb & gutter, guardrail, drainage ditches and culverts, and concrete sidewalks. ANTICIPATED START DATE: May 27, 2024 SUBSTANTIAL COMPLETION DATE: September 31, 2024 FINAL COMPLETION DA

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
Location
Duluth, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Brighton Beach Road Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brighton Beach Road Reconstruction” is an infrastructure initiative in the Water Supply and Storage sector, located in Duluth, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of full depth reconstruction of Brighton Beach Road along a new alignment through Brighton Beach Park from TH 61 to Congdon Boulevard. The work includes turn lanes on TH 61, bituminous roadway, curb & gutter, guardrail, drainage ditches and culverts, and concrete sidewalks. ANTICIPATED START DATE: May 27, 2024 SUBSTANTIAL COMPLETION DATE: September 31, 2024 FINAL COMPLETION DATE: June 23, 2025

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Duluth

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project