logo
ProjectPre-Design

Brighton Mountain Wind Project

Pre-design · New Brunswick · Last reported May 2024

Source: Dodge USA

A proposed 58 turbines to rural Carleton County with a total 350 MW capacity.

Status
Prospective
Sector
Wind, Power Generation (CCGT), Commercial
Location
Carleton, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Brighton Mountain Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brighton Mountain Wind Project” is an infrastructure initiative in the Wind sector, located in Carleton, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 58 turbines to rural Carleton County with a total 350 MW capacity.

Budget

Location

Country

Canada

State

New Brunswick

City

Carleton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Commercial

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project