Brightwood Drive Water Main Replacement
Sector: Road • Location: Marion, Ohio, United States
Source: The Marion Star
Aqua Ohio is replacing 1,826 feet of water main along Brightwood Drive, upgrading from a 107-year-old cement pipe to a larger ductile iron pipe to improve water flow. The project includes the installation of four new fire hydrants and five new valves, and will connect new water main taps to service lines for 25 homes along the route.
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Metal, Steel
- Location
- Marion, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- The Marion Star
ConstructChat
Ask ConstructChat about Brightwood Drive Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Aqua Ohio is replacing 1,826 feet of water main along Brightwood Drive, upgrading from a 107-year-old cement pipe to a larger ductile iron pipe to improve water flow. The project includes the installation of four new fire hydrants and five new valves, and will connect new water main taps to service lines for 25 homes along the route. |
Original sector | Water Infrastructure |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Marion |
Source
Source | The Marion Star |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Metal, Steel |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
