logo
ProjectPlanning Schematics

Brigis 1A Battery Energy Storage System

Planning schematics · New York · Last reported Jan 2025

Source: Dodge

construction and equipping of a battery energy storage system with an estimated storage capacity of 5 Megawatts. The battery storage system consists of six Tesla Megapack storage systems, concrete pads for equipment, including transformers, switchboards, and metering capable of providing 20 MW hours of energy storage capacity total per day. The battery energy storage system will total 2,200 square

Status
Prospective
Sector
Cement, Consumer Products, Commercial, Energy Storage, Power Generation (CCGT), Raw Materials
Location
Flushing, New York, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Brigis 1A Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brigis 1A Battery Energy Storage System” is an infrastructure initiative in the Cement sector, located in Flushing, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

construction and equipping of a battery energy storage system with an estimated storage capacity of 5 Megawatts. The battery storage system consists of six Tesla Megapack storage systems, concrete pads for equipment, including transformers, switchboards, and metering capable of providing 20 MW hours of energy storage capacity total per day. The battery energy storage system will total 2,200 square feet and will be located on an 8,500 square foot parcel of land

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Flushing

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Consumer Products, Commercial, Energy Storage, Power Generation (CCGT), Raw Materials

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project