Brilhante Transmissora Transmission Line Project
Active · Brazil
Source: World Bank Group
In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission L
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Brilhante Transmissora Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission Line Imbirussu - Sidrolandia; 230kV 101km Transmission Line Sidrolandia - Anastacio. The three substations were: substation Sidrolanddia (230kV), substation Rio Brihante(230kV) and substation Ivinhema (230kV). Brilhante Transmissora de Energia, Ltda was formed as the project company. The total project cost was estimated at US $226.35 million. Financial close took place on June 29, 2010 and comprised BRL 211.7m (US $119.2 million) of equity and a BRL 190.3m (US $107 million) 14-year term loan provided by mandated arranger Banco Nacional de Desenvolvimento Economico e Social (BNDES). In January 2011, the company was granted an additional US$ 74.7 million (BRL 121.9 million) loan contract from BNDES, a state-owned development bank. In December 2011, the transmission line commenced commercial operation. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia