Brilhante Transmissora Transmission Line Project
Sector: Commercial • Location: Brazil
Source: World Bank Group
In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission L
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission Line Imbirussu - Sidrolandia; 230kV 101km Transmission Line Sidrolandia - Anastacio. The three substations were: substation Sidrolanddia (230kV), substation Rio Brihante(230kV) and substation Ivinhema (230kV). Brilhante Transmissora de Energia, Ltda was formed as the project company. The total project cost was estimated at US $226.35 million. Financial close took place on June 29, 2010 and comprised BRL 211.7m (US $119.2 million) of equity and a BRL 190.3m (US $107 million) 14-year term loan provided by mandated arranger Banco Nacional de Desenvolvimento Economico e Social (BNDES). In January 2011, the company was granted an additional US$ 74.7 million (BRL 121.9 million) loan contract from BNDES, a state-owned development bank. In December 2011, the transmission line commenced commercial operation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |