Brilhante Transmissora Transmission Line Project

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission L

Project Information FAQ

Project Information

5 Q
The project “Brilhante Transmissora Transmission Line Project” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2009, federal electricity regulator Aneel signed a 30-year BOT contract with Elecnor [Spain] and Cobra Instalaciones y Servicios SA [Spain] to build, operate and maintain three 230kV transmission lines and substations totaling 444km. The shareholding percentage was not known. The three transmission lines included 230kV 296km Transmission Line Chapadao - Imbirussuu; 230kV 48km Transmission Line Imbirussu - Sidrolandia; 230kV 101km Transmission Line Sidrolandia - Anastacio. The three substations were: substation Sidrolanddia (230kV), substation Rio Brihante(230kV) and substation Ivinhema (230kV). Brilhante Transmissora de Energia, Ltda was formed as the project company. The total project cost was estimated at US $226.35 million. Financial close took place on June 29, 2010 and comprised BRL 211.7m (US $119.2 million) of equity and a BRL 190.3m (US $107 million) 14-year term loan provided by mandated arranger Banco Nacional de Desenvolvimento Economico e Social (BNDES). In January 2011, the company was granted an additional US$ 74.7 million (BRL 121.9 million) loan contract from BNDES, a state-owned development bank. In December 2011, the transmission line commenced commercial operation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data