Brinkerhoff Merritt Water Main Interconnect
Closed · New York · Last reported Apr 2024
Source: Dodge USA
This Project generally consists of furnishing and installing an emergency interconnection between the existing Brinkerhoff and Merritt Park water systems, including trenched and horizontally directionally drilled water main, along with a meter/control vault
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment
- Location
- Fishkill, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brinkerhoff Merritt Water Main Interconnect
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project generally consists of furnishing and installing an emergency interconnection between the existing Brinkerhoff and Merritt Park water systems, including trenched and horizontally directionally drilled water main, along with a meter/control vault |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Fishkill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
