logo

Bristol Myers Squibb East Syracuse Pharmaceutical Manufacturing Facility

Sector: Car parking • Location: United States

Source: Pharmaceutical Technology

Project
Closed

The Bristol Myers Squibb East Syracuse campus is more than 60 years old. Launched in 1943, the pharmaceutical manufacturing facility made nearly 70% of the penicillin produced in the world until the mid-2000s. East Syracuse, New York, US 1943 2010 September 2013 (Phase I) More than $10m Biologics Hueber-Breuer Construction The Bristol Myers Squibb East Syracuse campus is more than 60 years old. La

Project Information FAQ

Project Information

4 Q
The project “Bristol Myers Squibb East Syracuse Pharmaceutical Manufacturing Facility” is an infrastructure initiative in the Car parking sector, located in United States. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bristol Myers Squibb East Syracuse campus is more than 60 years old. Launched in 1943, the pharmaceutical manufacturing facility made nearly 70% of the penicillin produced in the world until the mid-2000s. East Syracuse, New York, US 1943 2010 September 2013 (Phase I) More than $10m Biologics Hueber-Breuer Construction The Bristol Myers Squibb East Syracuse campus is more than 60 years old. Launched in 1943, the pharmaceutical manufacturing facility made nearly 70% of the penicillin produced in the world until the mid-2000s. Initiated in 2010, the project aimed to transform the site from a penicillin-manufacturing facility into a park-type biotech research centre. It was completed in 2013, reflecting the company’s overall strategy. The project took nearly three years to complete. It involved the demolition of 50 buildings on the campus, which have become obsolete and remained idle since penicillin production was phased out in mid-2000s. The project was completed at a cost of more than $10m. The site is a large campus of 118 buildings. Spread over 90 acres, it accommodates vital facilities such as the latest biotechnology process development laboratories. There is about 1.2 million square feet of space dedicated to administration, research and manufacturing. State-of-the-art equipment within the facility includes 5,000l fermentation bioreactors. The first phase in the site’s transformation established green areas and demolish structures related to previous antibiotic manufacturing. Buildings that accommodate laboratories, administration and manufacturing, occupying more than 500,000ft² of space were torn down during this phase. The demolition freed nearly 42% of the total square footage of the campus. The existing laboratories were renovated to host wet chemistry and instrument labs. Four buildings, including chemical laboratories and office areas, were also combined. The proposed second phase is expected to oversee the end of more obsolete structures. If approved, it will include the demolition of the administration building at the plant’s entrance from Thompson Road, which is one of the few buildings visible to the public from the road. A total of 150,000ft² of space will be demolished. The project reduces the facility’s total operating expenditure and total energy consumption. Other green elements of the project include reusing and recycling the materials. However, no new structures were built as part of the project. The lead contractor for the project is Hueber-Breuer Construction Co. The contract included design and construction services. The firm undertook activities such as expanding good manufacturing compliance, and adding capacities for simultaneous production and bioreactor harvest with centrifuge technology. It also renovated the utilities and support systems within the facility. For decades, the facility has developed a bulk active antibiotic that constitutes the active pharmaceutical ingredient for producing penicillin. However, in the last decade, the facility’s operations have shifted to developing processes to manufacture biologics, or medicines made from plant and animal-derived cells. The facility has the capacity to make biologic medicines for clinical trails and commercial drug launch. Full-scale production can be carried out in smaller volumes in the Syracuse facility. Large-scale production will be performed at other Bristol Myers facilities. The Syracuse facility develops biologics by growing animal or plant-derived cells in highly controlled environments. The cells are mixed with the correct amount of oxygen and nutrients and kept for the right time limit, temperature and pH. During the process, the cells produce proteins that are harvested, purified and made into biologic drugs that treat a host of diseases, including cancer, arthritis and diabetes. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data